The former colliery was serviced by an existing rail link and abuts the Aire and Calder Navigation Canal, allowing Konect62 the opportunity for tri-modal (road, rail and water) connectivity.
The site has been remediated by the vendor, allowing creation of a substantial industrial/logistics hub at an important strategic location close to the A1(M) and M62 motorway.
Two neighbouring plots have been sold to The Coalfields Regeneration Trust, and for use as an Energy from Waste Plant respectively.
The development site is well located, both junctions 33 and 34 of the M62 are less than a 4-mile drive from Konect62.
Prior to construction, the vendor will be completing site access and internal road construction works.
The first phase of development will include for 4 units, with the largest able to accommodate up to 735,000 square feet.
A landscape buffer will surround each plot respectively, as well as a wider landscape buffer on the development’s perimeter.
£200m
Development Value
7
Units
1.418m
Total Square Feet
TBC
Due for Completion
Q3 2021
Reserved Matters Planning Submission
Q4 2022
Phase 1 Construction Commences
Q4 2023
Phase 1 Construction Completes
Q4 2023
Phase 2 Planning Submission
TBC
Phase 2 Planning Granted
TBC
Phase 2 Construction Commences